The first thing that disappears after a major cyclone is communication.
Power lines fall. Mobile towers fail. Internet connections vanish. Roads are cut by floodwater and landslides. Communities that were connected hours earlier suddenly find themselves isolated.
When Cyclone Seroja struck Western Australia’s Mid-West in April 2021, the scale of disruption was immediate. More than 26,000 households lost power. Nearly 200 mobile phone towers went offline. Across a region spanning more than 130,000 square kilometres, towns that rarely experienced cyclones were left without the basic systems that modern infrastructure depends on.
For the engineers tasked with helping restore those lifelines, even sending a fee proposal became an exercise in improvisation. With no internet and only intermittent mobile reception, the proposal was delivered by text message.
Across the Tasman Sea, Cyclone Gabrielle delivered a similar blow to New Zealand’s North Island in 2023. The damage to critical infrastructure, including bridges and roads, was both widespread and devastating.
Mobile phone coverage in parts of Tairāwhiti (Gisborne) disappeared for days. Communities could only be contacted by knocking on doors. Shops remained open but payments had to be made in cash because electronic systems had failed.
In moments like these, infrastructure delivery is stripped back to first principles. The systems that normally govern planning, procurement and design suddenly fall away. What remains is something far more fundamental. Trust, local knowledge and the ability to make practical decisions when perfect information does not exist.